top of page
Search
Les Ellaby

We love problematic ground/foundations

For difficult groundworks and foundation base problems we at PowerCem are happy to provide sensible sustainable engineered answers.

Constructing an 80 tonne per m2 crane platform from wet alluvium in-situ soils, designing a crack free large, shed settlement free subbase in 4m of in-situ PFA.



These and similar stabilisation challenges require different thinking and a very a different product. Our RoadCem zeolite particle wrapping technology provides us with the tool to deal with mixed/weak ground conditions, which can include made ground, alluvium, silts and peats.

Not forgetting high sulphate clays.

Call our technical helpline for advice: 0800 756 1360

5 views0 comments

Comments


bottom of page